Build to Lock-Up Inclusions

 

Build to Lock-Up Does Not Include:

x     Site costs such as:

x     Delivery or off-loading at site.

x     Any excavation works including cutting, filling or excavation for driveway, footpath, septic tank, biocycle, plumbing, electrical or telephone wiring.

x     Brick piering or concrete pads/footings.

x     Concrete slabs for carports, garages or curtain walls or for the enclosing of the dwellings sub floor.

x     Boundary peg, clearing of land, sediment control, excavations, driveway or access construction

x     Power, water, gas or sewer connections.

x     Council fees or Home Owners Warranty fees.

x     Engineer's specifications for wind category above W33, snow loading, driveway design, retaining wall, slabs or soil classification.

x     Electrical/Gas wiring, fittings or appliances and services thereto.

x     Plumbing fittings, installation of downpipes, water systems, fittings and services thereto.

x     Fly screens for windows or doors.

x     External stairs, landings and handrailing/balustrading to stairs and decks.

x     Any internal finishings including; P.C. items, tiling, appliances and cupboards.

x     Any sanding, sealing or staining of wooden floors or floor coverings of any sort.

x     Interior stud wall cladding, internal doors, internal trims or handrails/balustrading to stairs and lofts.

x     Fireplaces, heating or cooling services, fans, light fittings, floor coverings or furnishings.

x     Internal or external paint and/or sealing.

 

NOTE :   After Contract Signing, any changes from standard inclusions will incur an $1000.00 fee and a Variation to Contract will be drawn up with an invoice to follow for 50% of the variation followed by the balance when work complete. Before contracts are signed, clients may vary the standard inclusions without incurring the variation fee.