Build to Completion Inclusions

 

CONSTRUCTION MATERIALS AND BUILD TO LOCK-UP :

Refer to Build to Lock-up Inclusions.

INTERNAL FINISHING:

P.C. INCLUSIONS:

NOTE : These items may vary depending on the size of dwelling and quoted price.

 

BUILT TO COMPLETION DOES NOT INCLUDE:

x            All  site costs referred to as ‘does not include” in Built to Lock-up Inclusions.

x            Council fees or Home Owners Warranty fees.

x            Engineer's specifications for wind category above W33N, snow loading, driveway design, retaining wall or    soil classification.

x            Floor coverings, or  sanding, staining/sealing staircase and T&G flooring.

x            Furnishings, curtains, drapes, flyscreens, light fittings or ceiling fans, fireplaces, heating or cooling services.

x            External stairs, landings and hand-railing/balustrading to stairs and decks.

x            Internal & external painting not included.

x            Connection to services including all drainage, sewer, water, stormwater and electrical.

 

NOTE :   After Contract Signing, any changes from standard inclusions will incur a $100.00 fee and a Variation to Contract will be drawn up with an invoice to follow for 50% of the variation followed by the balance when work complete. Before contracts are signed, clients may vary the standard inclusions without incurring the variation fee.